Canal/River front/Dame/ catchment area - More than 110 KM and 5000 Hectare.
Darvywati river rejuvenation project Jaipur. Ch-0.0 KM to Ch-47.5 KM for TPL-SUCG consortium. 110.0 Km (Included Out fall Location survey)
Dam detail engineering survey for Darvywati river rejuvenation project. Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam. For TPL-SUCG consortium.
Cadastral Survey for Darvyvati River project area. From Ch- 0.00 to Ch-47.0 K.M for TPL-SUCG consortium.
No. | Project Name | Work | Area/Length | File |
---|---|---|---|---|
1. | Darvywati River | Darvywati river rejuvenation project Jaipur. Ch-0.0 KM to Ch-47.5 KM for TPL-SUCG consortium. (Included Out fall Location survey) | 110.0 Km. | Download |
2. | Darvaywati River- Topographical Survey | Darvaywati River catchment area detail topographical survey work. Both side 500.0m.from Ch-0.0 to Ch-47.5 KM for TPL-SUCG consortium. | 4700.00 Hectare | Download |
3. | Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam | Dam detail engineering survey for Darvywati river rejuvenation project. Majar Dam, Ambabari Dam, Gulaar Dam,Ramchandrapura Dam. For TPL-SUCG consortium. | --- | --- |
4. | Cadastral Survey | Cadastral Survey for Darvyvati River project area. From Ch- 0.00 to Ch-47.0 K.M for TPL-SUCG consortium. | --- | --- |
Contact us today for free conslutaion or more information.
Get In Touch© 2018 CADMAX . . Terms and Condition
Design & Developed CREADIG